Benjamin Shyong
Staff TPM, Manufacturing at Meta · ex-Apple
San Francisco, CA · benjamin@ikigaiendeavors.com · benjaminshyong.com · linkedin.com/in/benjaminshyong
About
A decade shipping consumer hardware at Apple and Meta — iPad Pro, Apple Special Projects, now Ray-Ban Display. Cross-functional convergence across mechanical, electrical, firmware, supply chain, and factory ops under real deadlines. Factory buildouts across Shanghai, Shenzhen, Chengdu, Zhengzhou, Tangshan, Nanjing, Weifang, Hanoi, and Taipei. Bilingual English / 中文 — turns out to matter on the floor in China at midnight.
Outside the day job: building AI agents, winning hackathons around SF, and operating a five-property short-term-rental brand on software I write myself.
Experience
Meta · Staff TPM, Manufacturing — AR Glasses (Ray-Ban Display)
Jun 2022 — presentSunnyvale, CA
- Manufacturing program owner for AR glasses: factory readiness, yield improvement, throughput (UPH) optimization, build-issue triage.
- Cross-functional lead aligning design (DFx, MTE, PD), engineering, and ops to hit NPI build targets.
- Influence product design direction with prototype yield data, DOE analysis, and exec-level presentations.
- Single-threaded owner of prototype build issues — root cause and corrective action driven by data.
- Brought up new vendors and stood up new manufacturing processes for the new AR glasses product.
Apple · Sr Manufacturing Quality Engineer — Softgoods
Oct 2020 — May 2022Cupertino, CA
- Product Quality Manager lead for iPhone Leather Wallet (Fall 2020) and a 2021 unreleased product.
- Owned factory yield projections; drove process and material improvements through to actualization.
- Built factory quality readiness — inspection metrology development, OQC/IQC correlation, product traceability.
- Aligned product specs and cosmetics with Product Design; led factory-side implementation.
Apple · Sr Operations Program Manager — Softgoods
Jun 2019 — Oct 2020Cupertino, CA
- Final-assembly NPI Operations lead for iPhone Leather Sleeve (Fall 2020) and 2021 AirTag accessories.
- Brought up second-site final-assembly factory in Thailand — capacity planning, qualification, and CapEx optimization.
- Material Program Manager: material reviews, clear-to-build projections, supplier allocation across GSMs.
- CapEx Program Manager: fixture and equipment release, cost savings, end-to-end budget roll-up.
- Sustaining operations across capacity, supply commits, daily I/O, and labor tracking at the contract manufacturer. PRQ lead for post-ramp qualifications and cost-savings via material and process changes.
Apple · Special Project — Health Tech (concurrent)
Oct 2018 — May 2019Cupertino, CA
- Tapped by Sr Director to lead contract-manufacturer bring-up for a new Health Tech product, concurrent with the iPad Pro OPM role.
Apple · Operations Program Manager — iPad Pro
May 2016 — Jun 2019Cupertino, CA
- NPI Operations lead ramping two iPad Pro products from prototype to mass production: J207 (10.5″ iPad Pro, Summer 2017) and J320 (12.9″ iPad Pro, Fall 2018).
- Planned and executed operations budgets tied to build objectives and unit quantities for both programs.
- Led phase-gate reviews for cross-functional approvals to ramp the factory in support of ex-factory ship commits.
- Managed program-critical issues and weekly executive presentations.
Lincoln Electric · Asia Pacific Strategic Assignment
Jun 2014 — Apr 2016Shanghai, China
- Strategic operations management reporting directly to Sr VP of Operations; 60% travel across Asia.
- Directed pull-system ERP rollout across five China facilities (Shanghai, Nanjing, Tangshan, Jinzhou, Zhengzhou).
- Reduced net China inventory by 31% within seven months of pull-system implementation.
- Managed hiring and training of China staff.
Lincoln Electric · Operations Planning Team Leader
Nov 2013 — Jun 2014Torreon, Mexico
- Supervised planning team of three direct reports on Torreon attainment, exports, and overdue orders.
- Coordinated with production supervision on capacity planning.
- Developed stocking strategies and inventory targets aligned with customer fill-rate objectives.
Lincoln Electric · Senior Buyer
Nov 2011 — Nov 2013Cleveland, OH
- Negotiated planning parameters and reduced working capital across the commodity supply base.
- Strategic sourcing and cost savings for $2M Transformer and $4M Fasteners & Hardware portfolios.
- Six Sigma DMAIC analysis of invoice payment process delays (price and quantity blocks).
Lincoln Electric · Global Sourcing Engineer (Rotation)
Oct 2011 — Nov 2011Shanghai, China
- Sourcing strategy supporting marketing objectives for new product development.
- Navigated Chinese export/import regulations; completed PPAP and supplier audits.
Lincoln Electric · Engineering Operations Trainee
Sep 2009 — Sep 2011Cleveland, OH
- Two-year rotational program: supply chain, production planning, and manufacturing process improvement.
Education
Purdue University · B.S. Systems Industrial Engineering
2004 — 2008West Lafayette, IN
Honors & Awards
- 1st place · Cerebral Valley × Rosewood Hospitality 2030 Hackathon — Red Thread, an agentic OS for luxury hospitality (May 2026)
- 1st place · DataHub × Nebius Hackathon — Data-OnCall, a 4-agent data-quality incident response system with a first LLM fine-tune (Apr 2026)
- Top 6 finalist · AWS Builder Loft "Build YC's Next Unicorn" Agent Hack Day — LoopOS, a multiplayer MCP-native back-office agent (Apr 2026)
- 1st place · Nebius.Build SF — Injester, agent-to-merchant commerce infrastructure. Demoed at NVIDIA GTC 2026 the following Tuesday (Mar 2026)
Languages
- English — native
- Mandarin / 中文 — bilingual, professional
Selected outside work
- Red Thread — Agentic OS for luxury hospitality. Live A2A handoff between two real machines (Threadkeeper on Vercel ↔ elias on a Mac mini via Cloudflare tunnel) with real Claude on each side. Live demo: app.redthread.boutique
- LoopOS — Multiplayer MCP-native agent that replaces the back office across five short-term rentals. Multiple AI clients (Claude/ChatGPT/Goose) share one durable backend via Reboot.
- Stay Ikigai — Operator of a five-property short-term-rental brand on a custom Property Management System I built (Next.js + Postgres + Beds24 + Gemini). 4.95★ · 423 reviews. stayikigai.com
- AgentMES — Manufacturing execution system for autonomous agents. OpenAI's 7-stage AI-Native Engineering Workflow as a bipartite state machine — agents do throughput work, humans own the judgment gates.
- Conclave — Personal AI mastermind council: seven archetypes (Arnold, Jobs, Buffett, Mandela, Hassabis, Sun Tzu, Bezos), each with its own per-persona RAG vector store, synthesized into a Council Verdict.
Full project context, hackathon recaps, and writing at benjaminshyong.com.